| |
|
|
| |
|
|
| |
|
| |
|
| Project |
Waters Edge, Battaramulla |
| |
www.WatersEdge.lk |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation and Commissioning of a fully fledged Building Management System with connectivity to lighting (CBus), HVAC (BacNet), Energy Meters (ModBus) and Hitachi Chiller (LonWorks). In addition to general Monitoring and Controlling, every large scale AHU is equipped with VSDs to save energy. Other features include Scheduling, Alarming, Trending and Reporting. |
| |
|
| Year |
2005 |
| |
|
| |
|
| Project |
Cinnamon Grand Hotel, Colombo |
| |
www.CinnamonHotels.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation and Commissioning of Chiller
Management System with connectivity to Mc Quay Chillers, CHW pumps, COW pumps and Cooling towers.
In addition to general monitoring and controlling of the entire HVAC portion of the building, the
proposed solution is targeted as an energy saving solution. Main energy saving activities of this
solution include, chiller set-point reset, Optimum CT operation, Maintaining COP level, Optimum
usage of CHW and COW pumps and Night setback operation. |
| |
|
| Year |
2006 |
| |
|
| |
|
| Project |
MAS Fabric Park, Thulhiriya |
| |
www.MASHoldings.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of Fiber Optic WAN
to cover more than 200 acres of land inter-connecting 18 locations that include industrial lots, power
plants, water treatment plant, central control station, training centers, administration buildings and
housing scheme. This WAN is designed to cater for Voice (IP Phones), Video (IP-CCTV system) and Data
(Internet). |
| |
|
| Year |
2007 |
| |
|
| |
|
| Project |
Hemas Hospital, Wattala |
| |
www.MASHoldings.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of
Building Management System that interconnects all the subsystems of the hospital including
HVAC system, Power & Fire. |
| |
|
| Year |
2008 |
| |
|
| |
|
| Project |
MAS Institute of Management & Technology, Thulhiriya |
| |
www.mimt.lk |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of
Building Management System that interconnects all the subsystems of the hospital including
HVAC system, Power & Fire. |
| |
|
| Year |
2008 |
| |
|
| |
|
| Project |
SLT IT Data Center at SLT Head Office, Colombo 01 |
| |
www.slt.lk |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of
Building Management System that interconnects all the subsystems of the hospital including
HVAC system, Power & Fire. |
| |
|
| Year |
2009 (On going) |
| |
|
| |
|
| Project |
Brandix Essentials, Ratmalana (LEEDS – Gold Partner) |
| |
www.brandix.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of
Building Management System that interconnects all the subsystems of the office complex and
factory including HVAC, Power, Water, Indoor Air Quality & Fire. This BMS is especially
designed to monitor and control various Green Building parameters required by LEEDs. The
BMS is connected with the York Chiller. |
| |
|
| Year |
2010 |
| |
|
| |
|
| Project |
Brandix Essentials, Koggala |
| |
www.brandix.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of Building Management System that interconnects all the subsystems of the intended green factory including HVAC, Power, Indoor Air Quality, Water & Fire. The BMS will be connected with the York Chiller. |
| |
|
| Year |
2010 |
| |
|
| |
|
| Project |
Residence of His Excellency the Ambassador of the State of Kuwait in Colombo |
| |
|
| Description |
Design, Supply, Installation & Commissioning of
Local Area Network and Telephone system that incorporate data and voice infrastructure of
the premises. |
| |
|
| Year |
2010 (On going) |
| |
|
| |
|
| Project |
Brandix Casualwear, Ratmalana I |
| |
www.brandix.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of Building Management System that interconnects all the subsystems of the office complex and factory including HVAC, Power, Water, Indoor Air Quality & Fire. The BMS will be connected with the York Chiller. |
| |
|
| Year |
2010 (On going) |
| |
|
| |
|
| Project |
Brandix Casualwear, Ratmalana II |
| |
www.brandix.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of Building Management System that interconnects all the subsystems of the office complex and factory including HVAC, Power, Water, Indoor Air Quality & Fire. The BMS will be connected with the York Chiller. |
| |
|
| Year |
2010 (On going) |
| |
|
| |
|
| Project |
TAJ Airport Garden Hotel, Seeduwa, Katunayake |
| |
www.tajhotels.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of Building Management System that interconnects all the subsystems of the hotel including HVAC, Power, Water, Indoor Air Quality & Fire. |
| |
|
| Year |
2010 (On going) |
| |
|
| |
|
| Project |
Brandix Intimate Apparels , Minuwangoda |
| |
www.brandix.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of Building Management System that interconnects all the subsystems of the office complex and factory including HVAC, Power, Water, Indoor Air Quality & Fire. The BMS will be connected with the York Chiller. |
| |
|
| Year |
2011 (On going) |
| |
|
| |
|
| Project |
Brandix Intimate Apparels , Katunayake |
| |
www.brandix.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of Building Management System that interconnects all the subsystems of the office complex and factory including HVAC, Power, Water, Indoor Air Quality & Fire. The BMS will be connected with the York Chiller. |
| |
|
| Year |
2011 (On going) |
| |
|
| |
|
| Project |
Brandix Intimate Apparels , Mirigama |
| |
www.brandix.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of Building Management System that interconnects all the subsystems of the office complex and factory including HVAC, Power, Water, Indoor Air Quality & Fire. The BMS will be connected with the York Chiller. |
| |
|
| Year |
2011 (On going) |
| |
|
| |
|
| Project |
Brandix Intimate Apparels , Welisara |
| |
www.brandix.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of Building Management System that interconnects all the subsystems of the office complex and factory including HVAC, Power, Water, Indoor Air Quality & Fire. The BMS will be connected with the York Chiller. |
| |
|
| Year |
2011 (On going) |
| |
|
| |
|
| Project |
Cinnamon Grand Hotel , Colombo |
| |
www.cinnamonhotels.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation and Commissioning of Central Energy Monitoring system that integrates with existing BMS for the purposes of monitoring and sub metering. This system communicates with power analyzers using MODBUS protocol and integrates with the BMS system via BACnet protocol. |
| |
|
| Year |
2011 |
| |
|
| |
|
| Project |
Hotel Chaaya Tranz , Hikkaduwa |
| |
www.johnkeellshotels.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of Building Management System that interconnects all the subsystems of the hotel including HVAC, Lighting, Power, Water, Indoor Air Quality & Fire. The BMS will be connected with Daikin Chiller. |
| |
|
| Year |
2011 |
| |
|
| |
|
| Project |
Hotel Randeli Island , Maldives |
| |
www.nostersworld.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of Lighting and Shades Controls system that interconnects all the subsystems of the hotel including HVAC, Lighting, Power, Water, Indoor Air Quality & Fire. |
| |
|
| Year |
2011 (On going) |
| |
|
| |
|
| Project |
CECB Head Office , Colombo |
| |
www.cecb.lk |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of Building Management System that interconnects all the subsystems of the head office including HVAC, Power, Water, Indoor Air Quality & Fire. The BMS will be connected with Daikin Chiller. CECB is the premier building consultancy arm that is owned by the government of Sri Lanka. |
| |
|
| Year |
2011 (On going) |
| |
|
| |
|
| Project |
Bentota Beach Hotel , Bentota |
| |
www.johnkeellshotels.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation and Commissioning of Central Energy Monitoring system for the purposes of monitoring and sub metering. This system communicates with power analyzers using MODBUS protocol. |
| |
|
| Year |
2011 |
| |
|
| |
|
| Project |
Sethsiripaya , Colombo |
| |
www.nostersworld.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation & Commissioning of Building Management System that interconnects two subsystems of the government office building including HVAC and Power with tenant billing facility. |
| |
|
| Year |
2011 (On going) |
| |
|
| |
|
| Project |
Chaaya Citadale , Kandy |
| |
www.chaayahotels.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation and Commissioning of Central Energy Monitoring system for the purposes of monitoring and sub metering. This system communicates with power analyzers using MODBUS protocol. |
| |
|
| Year |
2011 |
| |
|
| |
|
| Project |
Cinnamon Lodge , Habarana |
| |
www.cinnamonhotels.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation and Commissioning of Central Energy Monitoring system for the purposes of monitoring and sub metering. This system communicates with power analyzers using MODBUS protocol. |
| |
|
| Year |
2011 (On going) |
| |
|
| |
|
| Project |
Chaaya Village , Habarana |
| |
www.johnkeellshotels.com |
| |
|
 |
| |
|
| Description |
Design, Supply, Installation and Commissioning of Central Energy Monitoring system for the purposes of monitoring and sub metering. This system communicates with power analyzers using MODBUS protocol. |
| |
|
| Year |
2011 |
| |
|
|
|
|
| |
|
|
|
 |